2016 Tracking Thread
Estimated delivery date to San Diego is 5/4.
I have no idea what my hold up is, I was produced 4/4 and ordered weel liners but no spray in. Other people who's trucks were made same day already made it to the dealer and mine is still Awaiting Shipment ....
Mine was build on the 3/28 and I still don't have it.....it seem a hit and miss with the transportation after it leave the plan, mine left on the 3/29 and has been sitting in Toronto since the 4/01 so a little less then 2 weeks.
My estimated delivery went from 5/4 to 4/29 to 4/27 to 4/21 and today delayed to 4/23...it's been "In Transit" since 3/31. I have a rail car number but no status has ever been available on it.
Blue Jeans KR 3.5 EB 4x4 6.5' bed, max tow, all the bells and whistles (no bed liner or wheel well liner, those will be done on delivery). Coming to Dallas, TX
Ordered 3/4
Built 4/4
Original delivery date 4/24
Then 4/18
Then 4/16
Then 4/15
Now 4/14
COTUS says "delivery date 4/14"
And it says "days to delivery 1"
I hope whoever is behind that math didn't have anything to do with the engineering...
Either way, can't wait!
Ordered 3/4
Built 4/4
Original delivery date 4/24
Then 4/18
Then 4/16
Then 4/15
Now 4/14
COTUS says "delivery date 4/14"
And it says "days to delivery 1"
I hope whoever is behind that math didn't have anything to do with the engineering...
Either way, can't wait!
Anyone else have a blend number that falls between these two numbers?
2201604094258 (Ned's truck, which has awaiting shipment status) and 2201604095051 (my truck which is in production still)
2201604094258 (Ned's truck, which has awaiting shipment status) and 2201604095051 (my truck which is in production still)