Are HDPP frames done in batches?
I read somewhere (can't remember where) that unlike regulat F150s the HDPP frames are done in batches. They get enough orders, they build them.
Is this the case? Would ordering a HDPP truck add time to the already long wait? Especially long since I'm looking at the Scab 8 foot bed.
Is this the case? Would ordering a HDPP truck add time to the already long wait? Especially long since I'm looking at the Scab 8 foot bed.


