Build Dates to avoid
#11
Senior Member
iTrader: (14)
Hungover employees? nobody likes working mondays? Now, this isnt meant to say that ALL workers are lazy and careless and so forth. In my particular case, I bought a monday truck (without knowing) AFTER the 4th of July weekend. Thats definitely a day you want to avoid, IMO.
#13
Ordered December 29th and built Monday February 8th. Took delivery March 3. I couldn't be happier. Truck has been perfect so far at 4600 miles. A/C seats work really well especially last week in Laughlin Nevada at 115 degrees. 2.7 engine is awesome towing. Mpg driving to Yosemite was 21.8 with cruise set at 68. Towed my sea Doo 1st time traveling 675 miles and averaged 19.7 miles to the gallon, cruise was set at 63( Ca speet limit towing 55mph).
Both trip I drove as smooth as possible to see what I could get. Love this truck!
Both trip I drove as smooth as possible to see what I could get. Love this truck!
#14
Senior Member
Looking to pick up an F150 from a local dealer. Have been looking at the inventory. Are there any build periods I should avoid, or maybe lets say purchase something built after a specific date or from a specific plant. Ive noticed some with build dates as old as Jan 2016. Is this typical or are these sitting on lots for specific reasons. Thanks!
The following users liked this post:
kendive (07-26-2016)