Anyone up for a meet in MA?
#26
Senior Member
nahh i got the back done...just finished. It took me and a buddy 6hrs. stupid leaf spring clamps had to be grinded off. It looks awesome. The front is gunna suck. We could probably have it done in time but the problem is getting an alignment...i have to wait till monday to do it...im in Cheshire, CT doing the lift...if i wasnt 150 miles from foxboro i would say screw it..haha
#27
Nitrous user
nahh i got the back done...just finished. It took me and a buddy 6hrs. stupid leaf spring clamps had to be grinded off. It looks awesome. The front is gunna suck. We could probably have it done in time but the problem is getting an alignment...i have to wait till monday to do it...im in Cheshire, CT doing the lift...if i wasnt 150 miles from foxboro i would say screw it..haha
Im gonna head down, just spent 6 hours getting all my little raildust rust spots off my poor white paint.
#30
RDNK150
Won't be able to make it I have to work
Kids that ate still wet behind the ears should not be doing anything but tires batteries and LOF
guess who won to put a transmission in a 2012 Honda pilot with 457 miles on it
Kids that ate still wet behind the ears should not be doing anything but tires batteries and LOF
guess who won to put a transmission in a 2012 Honda pilot with 457 miles on it