Topic Sponsor
2015 - 2020 Ford F150 General discussion on the 13th generation Ford F150 truck.
Sponsored by:
Sponsored by:

Tracking Thread!! VIN's with Build Dates

Thread Tools
 
Search this Thread
 
Old 02-26-2015, 10:13 AM
  #3591  
Junior Member
 
tonyboards's Avatar
 
Join Date: Jan 2015
Posts: 24
Received 1 Like on 1 Post
Default

My truck has build date of March 2, expected delivery April 5, ordered on Dec 31, still in processing. NEED TRUCK NOW!
tonyboards is offline  
Old 02-26-2015, 10:23 AM
  #3592  
Senior Member
 
twotimer's Avatar
 
Join Date: Jan 2015
Posts: 240
Received 81 Likes on 45 Posts

Default

Mine is on tap to be built on 3/16. Yeah it's a Monday but I'll take it. I hope it doesn't go a few days early because that would be Friday the 13th !
twotimer is offline  
Old 02-26-2015, 10:25 AM
  #3593  
Senior Member
 
smallseafishie's Avatar
 
Join Date: Oct 2014
Location: Atlanta, GA
Posts: 217
Received 40 Likes on 27 Posts

Default

Holy moly! I just placed an order last week and it's suppose to come in by the end of March! I was expecting a 3 month wait! My countdown is 30 days from today!
smallseafishie is offline  
Old 02-26-2015, 10:30 AM
  #3594  
Member
 
bostondrummer781's Avatar
 
Join Date: Dec 2014
Posts: 70
Received 13 Likes on 9 Posts

Default

Wow, happy for all the movement here. There's gonna be a lot of 2015 F-150's cruising around this spring!
bostondrummer781 is offline  
Old 02-26-2015, 10:40 AM
  #3595  
Senior Member
 
CurryBob's Avatar
 
Join Date: Aug 2014
Location: Alexandria, AL
Posts: 2,408
Received 801 Likes on 490 Posts

Default

Originally Posted by twotimer
Mine is on tap to be built on 3/16. Yeah it's a Monday but I'll take it. I hope it doesn't go a few days early because that would be Friday the 13th !
The built date you get is more of a build week. It will go down the line the week of 16 March. Also their shifts are not m-f so a Monday car is not the first day of their week. The have 3 shifts working to cover 7 days a weeks for 10 hour shifts with 4 hours each day for maintenance.

They are really spitting them out now!!
CurryBob is offline  
Old 02-26-2015, 11:25 AM
  #3596  
Senior Member
 
roadPilot's Avatar
 
Join Date: Feb 2012
Location: SE Michigan
Posts: 3,125
Received 1,613 Likes on 910 Posts

Default

Originally Posted by twotimer
Mine is on tap to be built on 3/16. Yeah it's a Monday but I'll take it. I hope it doesn't go a few days early because that would be Friday the 13th !
More than likely that's your build week, not the day.

Your salesman can look up your order in a system that's referred to as 'vehicle visibility'. Among other things, this will show him when it has been scheduled for a specific DAY. If you have a cool salesman, s/he won't minding spending 30 seconds looking it up for you when you e-mail or call him/her.

When it gets to within 5-6 calendar days of the scheduled build DATE, they will assign what's called a "blend" number to it (this number will be in the top border area of your window sticker once you can access it). You can get your window sticker from COTUS after the vehicle has been 'blended' (about a day or so after it shows up as "In Production").

I'm going to make a separate thread explaining to everyone what a blend number is, since several people have asked.

Originally Posted by CurryBob
Also their shifts are not m-f so a Monday car is not the first day of their week. The have 3 shifts working to cover 7 days a weeks for 10 hour shifts with 4 hours each day for maintenance.
You almost got it right, CurryBob ...

DTP is not working three shifts. They have 3 crews running two shifts.

DTP is currently running two 10-hours shifts per day Mon-Fri. On Sat and Sun, they work one 10-hour shift each day.

Last I checked:
A-Crew works M-T 10 hours
B-Crew works Tu-F 10 hours
C-Crew works F, Sa, Su, and M (when A or B is off)

Therefore, Monday, Tuesday or Friday could actually produce a "Monday car" (but I wouldn't worry about that).
roadPilot is offline  
The following 4 users liked this post by roadPilot:
9 County (02-26-2015), CurryBob (02-26-2015), MarineLDO (02-26-2015), twotimer (02-26-2015)
Old 02-26-2015, 11:33 AM
  #3597  
Senior Member
 
roadPilot's Avatar
 
Join Date: Feb 2012
Location: SE Michigan
Posts: 3,125
Received 1,613 Likes on 910 Posts

Default

Recent movements:

29 JAN: Ordered
05 FEB: VIN issued
05 FEB: Schedule to build week of 02 MAR
13 FEB: Scheduled to build day of 02 MAR (Monday)
17 FEB: Estimated delivery 15 MAR
25 FEB: In Production (COTUS)
26 FEB: Blend number assigned; Window sticker available
27 FEB: Dealer invoice obtained

Looks like it's been blended in for next Tuesday 3/3.

I'm going to call that AM to find out when it will hit trim (that's where our HVAC is installed) and head over to watch it for a bit. It's ~4 hours from there until it rolls off as a finished truck.

Giggity-giggity!
roadPilot is offline  
Old 02-26-2015, 11:41 AM
  #3598  
Member
 
9 County's Avatar
 
Join Date: Jan 2015
Location: Orange County, CA
Posts: 76
Received 23 Likes on 20 Posts
Default

After 10 weeks, I finally have a VIN (ordered 12/15/14). FWIW, my fleet vendor who ordered it says the extended range tank is holding up production due to short supply. Sounds fishy to me as I haven't seen anyone else on here have that issue, and it seems like lots of ER tanks have been ordered and received. Brittany has not heard it either, but she says the fleet vendor could have more information. COTUS finally shows my VIN, but no build date. Brittany says it is scheduled for build late March.
9 County is offline  
Old 02-26-2015, 11:42 AM
  #3599  
Curmudgeon In Training
iTrader: (1)
 
MarineLDO's Avatar
 
Join Date: Jan 2015
Location: Westminster, MD
Posts: 372
Received 132 Likes on 71 Posts

Default

Originally Posted by roadPilot
Recent movements:

29 JAN: Ordered
05 FEB: VIN issued
05 FEB: Schedule to build week of 02 MAR
13 FEB: Scheduled to build day of 02 MAR (Monday)
17 FEB: Estimated delivery 15 MAR
25 FEB: In Production (COTUS)
26 FEB: Blend number assigned; Window sticker available
27 FEB: Dealer invoice obtained

Looks like it's been blended in for next Tuesday 3/3.

I'm going to call that AM to find out when it will hit trim (that's where our HVAC is installed) and head over to watch it for a bit. It's ~4 hours from there until it rolls off as a finished truck.

Giggity-giggity!

Looks like our trucks are taking the same patch. Will be neat watching your truck on the assembly line!

Hopefully not a stupid question, but how and/or where did you get your dealer invoice?


Lariat Scab, 3.5 e/b, Tuxedo Black with black interior, 502a, moon roof, tow pkg., tailgate step
MarineLDO is offline  
Old 02-26-2015, 11:46 AM
  #3600  
Member
 
9 County's Avatar
 
Join Date: Jan 2015
Location: Orange County, CA
Posts: 76
Received 23 Likes on 20 Posts
Default

Forgot to include my VIN, which is B08132. Far as I can tell, the B just means they've passed A99999. Per the VIN I'm scheduled for the Dearborn plant.
9 County is offline  


Quick Reply: Tracking Thread!! VIN's with Build Dates



All times are GMT -4. The time now is 11:46 PM.