Full Race Intercooler / CAC Upgrade Kit price listed and added to cart!
#511
Senior Member
Hmmm! I ordered at the end of April and was told 2 to 4 weeks. Expecting closer to 4! So hopefully I get it in time for the spring rain and upcoming towing that I have to do!
#512
i dont have anything to do with ordering or production, but i know our guys are doing a lot of F150 IC's daily so it might have sped up
The following 2 users liked this post by jetlag:
Full-Race Geoff (06-24-2013),
Spadey (06-25-2013)
#516
but added a thermostat controlled cooler valve and removed the factory coolant heat exchanger (oil warmer!!) . i will post a photo of this
The following users liked this post:
Spadey (06-25-2013)
#519
I appreciate Full-Race's shipping department on erring on the side of caution when packing this stuff. But DAMN!! Just spent 30 minutes or more just unpacking all the parts and removing the bubble wrap. Bubble wrap/tape was a SOB to get off without scratching the pipes. FedEx could have dragged the box behind their truck from pheonix to ohio and the parts would have been fine lol
Installing everything this afternoon after the truck gets detailed in and out.
Installing everything this afternoon after the truck gets detailed in and out.
#520
hi!
iTrader: (2)
I appreciate Full-Race's shipping department on erring on the side of caution when packing this stuff. But DAMN!! Just spent 30 minutes or more just unpacking all the parts and removing the bubble wrap. Bubble wrap/tape was a SOB to get off without scratching the pipes. FedEx could have dragged the box behind their truck from pheonix to ohio and the parts would have been fine lol
Installing everything this afternoon after the truck gets detailed in and out.
Installing everything this afternoon after the truck gets detailed in and out.