Changing a new truck order....
#1
Changing a new truck order....
My dealer is telling me that once the truck is scheduled to be built (In my case, the first week of October), that no changes can be made. I wanted to verify that my salesman has the correct info on that? Thanks in advance!
#2
Ford Truck Lover
That is correct. Scheduling is done based on configuration, trim and options, etc.
#3
Production Locked-In
Order's content has been locked in. Options cannot be changed and the order cannot be cancelled.
#5
Senior Member
iTrader: (3)
As soon as a VIN is assigned, no changes can be made. You have to make your changes while the order is still unscheduled.
Last edited by Pioneer74; 09-17-2018 at 12:28 PM.
The following users liked this post:
BadBoy4fun_wa (09-17-2018)
#6
Read above....nailed it!!
How long it takes is dependant on two things. One allocations at dealer and when it is actually accepted by Ford to be built. Sometimes that is right away, other times it can be a long time based on Dealership and Ford priorities.
In Terms of selection for production way too many factors. Currently quick would be a couple weeks and long is about a month. I am sure their might be some funky ocassional truck that is outside the normal on either end.
How long it takes is dependant on two things. One allocations at dealer and when it is actually accepted by Ford to be built. Sometimes that is right away, other times it can be a long time based on Dealership and Ford priorities.
In Terms of selection for production way too many factors. Currently quick would be a couple weeks and long is about a month. I am sure their might be some funky ocassional truck that is outside the normal on either end.
Last edited by BadBoy4fun_wa; 09-17-2018 at 12:35 PM.
The following users liked this post:
56ecoboost (09-17-2018)
Trending Topics
#8
mine was ordered 8/22, supposed to be delivered by 10/16
hasnt started "production" still in the 1st phase but I do have a VIN and it pulls up on the tracking website
hasnt started "production" still in the 1st phase but I do have a VIN and it pulls up on the tracking website
#9
Thinking about this more, I am assuming not even color can be changed once the truck is scheduled to be built? I have a vin number but cannot view it in COTUS yet. Production is not scheduled until the first week of October.
EDIT: COTUS is working. It says the truck is: "In Order Processing", which is the first step.
EDIT: COTUS is working. It says the truck is: "In Order Processing", which is the first step.
Last edited by jserr68594; 09-17-2018 at 06:31 PM.
#10
..